Mode: HCTT 300KV/900KVA
Cylinder type LV winding can be serial or parallel:
Single phase When serial connection, output voltage is 150kV 3A
Frequency: 50Hz When parallel connection, output voltage is 300kV/3A
Rated Capacity: 900kVA Waveform deviation ≤3%
Rated Voltage: LV voltage: 3kV; HV voltage: 300kV Unload Current: IO<8%
Rated Current: LV current: 150A HV Current: 3A Impedance voltage ≤8%
Over Current Ability: Continuous working for 3 minutes under 150% rated current, then thermal damage or distortion of the winding shall not be occurred.
Over Voltage Ability: Over voltage at 110% UH (330kV) for 60s., then it shall not happened any insulation damage for the testing transformer.
Insulation Level:18kV/1min(low voltage terminal to earth)
Noise:≤60dB PD Level: <5pC at rated voltage
Winding insulation performance:
HV winding to LV winding, measuring winding and ground > 2500MΩ
LV winding to HV winding, measuring winding and ground > 2500MΩ
Measuring winding to HV winding, LV winding and ground > 2500MΩ
Transformer Oil:
25# China made
Dielectric loss: less than 0.5%.
Operating Time: (starting from environment temperature)
One hour on and one hour off at 100% rated current & voltage;
Continuous working allowed at 80% rated current & voltage; and temperature rise of transformer winding is less than 65K, temperature rise of oil surface is less than 55K.
Injection and release valve for transformer oil are available.
Transformer Oil:
25# transformer oil is from Karamay Refinery. The oil indicator can reach the oil level for 500KV transformers. Factory test of test transformer should use new transformer oil supplying with transformers and perform oil inspection before or after factory test. Oil inspection report should be provided when the transformer delivered filled with oil. Quality of transformer oil should meet the requirements of SH0040-91, GB2536-90, GB7595-87, SD187-86, Class II A of IEC-296 standards. Components PCB are prohibited in the oil. When doing acceptance test on-site, the oil performance should satisfy the following requirements: DGA analysis of total hydrocarbons less than 10 mg/L, the breakdown voltage of the oil should not be less than 65kV/2.5mm, dielectric loss (90°C) is not more than 0.3%, water content is not more than 10mg/L, the gas content is not more than 1%.
Principle Diagram:
HIMALAYAL provides innovative products that comprise high voltage test equipment, full-set high voltage test instruments, on-site test systems and on-line monitoring systems, and services regarding tests, diagnostics and asset monitoring for clients in power industry. We help to ensure safety and reliability in the power generation, transmission and distribution.
Himalayal Corporation Limited
Tel:+86 21 5059 9069
Email: info@himalayal.com
http://www.himalayal.com
http://www.himalayal.com.cn