≤100kV Range
HCTT 50kV/200kVA Test Transformer
Home > Systems > AC Dielectric Test > AC Test Transformer > ≤100kV Range

HCTT 50kV/200kVA Test Transformer

Lead time: 50days

Mode: HCTT 50KV/200KVA
Cylinder type ,single modules                
Waveform deviation ≤5%
Single phase                                              
Unload Current: IO<8%
Frequency: 50Hz/60Hz                                        
Impedance voltage ≤8%
Rated Capacitance: 200kVA                    
Voltage Ratio of Measurement Winding : 1000:1
Rated Voltage: 50kV                                  
Rated current: 4A
(HV terminal of the transformer will be earthed through a current transformer 5/5 so as to check the current value of HV side and ensure safety of the operators and equipment)

Over Current Ability: Continuous working for 300S under 120% rated current, then thermal damage or distortion of the winding shall not be occurred.
Over Voltage Ability: Over voltage at 110% UH (55kV) for 60s., then it shall not happened any insulation damage for the testing transformer.
Noise: ≤65dB
PD Level: <10pC at 100%UH of complete test system;
Unevenness at 2 transformer in series: ≤±5%
Transformer Oil: 25# China made
Operating Time: (starting from environment temperature)
At 100%UH, 100%IH, working one hour;
And temperature rise of transformer winding is less than 65K, temperature rise of oil surface is less than 55K.
Protection: The surge arrestors 0.6kV shall be installed among excitation winding of the transformer and transfer winding for protection purpose.
Injection and release valve for transformer oil are available.

HCTT 50KV/200KVA  Test Transformer HCTT 50KV/200KVA  Test Transformer

HCTT 50KV/200KVA  Test Transformer HCTT 50KV/200KVA  Test Transformer

Insulation of Winding to Earth:
(HV winding to LV winding and measurement winding to earth) >2500MΩ
(LV winding to HV and measurement winding to earth) >2500MΩ
(measurement winding to HV and LV winding to earth) >2500MΩ
Insulation Level: 5kV/1min (LV winding AC Voltage)
Insulation Level: 5kV/1min (HV terminal AC voltage)

Electric Strength of Transformer Oil:
- Breakdown Voltage>60kV/2.5mm Moisture<10ppm
- Dielectric Loss<0.3% (at 90℃)
- Without acetylene in oil; Solidifying point>40

Transformer Oil: 
25# transformer oil is from Karamay Refinery. The oil indicator can reach the oil level for 500KV transformers. Factory test of test transformer should use new transformer oil supplying with transformers and perform oil inspection before or after factory test. Oil inspection report should be provided when the transformer delivered filled with oil. Quality of transformer oil should meet the requirements of SH0040-91, GB2536-90, GB7595-87, SD187-86, Class II A of IEC-296 standards. Components PCB are prohibited in the oil. When doing acceptance test on-site, the oil performance should satisfy the following requirements: DGA analysis of total hydrocarbons less than 10 mg/L, the breakdown voltage of the oil should not be less than 65kV/2.5mm, dielectric loss (90°C) is not more than 0.3%, water content is not more than 10mg/L, the gas content is not more than 1%.  

Principle Diagram: 

  
Where To Buy

Related Photos

Related Products