Isolation Transformer
HIT-120KVA/3000V/3000V Isolation transformer
Home > Systems > AC Dielectric Test > Isolation Transformer

HIT-120KVA/3000V/3000V Isolation transformer

Lead time: 45 days

Mode: HIT-120KVA/3000V/3000V
Oil immersed structure, double windings, set electrostatic shield between HV and LV, LV and coil.
Main function: isolate the power supply interference, reduce the interference to the system partial discharge.
Mode: HIT 120                                         Rated Current: 40A
Rated capacitance: 120kVA                     Impedance voltage: 6%
Single phase                                              Working time: same as reactor.
Input voltage: 3kV                                     Insulation level: 10kV/min
Output voltage: 3kV                                  Cooling method: ONAN

HIT-120KVA/3000V/3000V Isolation transformer HIT-120KVA/3000V/3000V Isolation transformer

HIT-120KVA/3000V/3000V Isolation transformer HIT-120KVA/3000V/3000V Isolation transformer
Principle Diagram: 

  
Where To Buy