Oil Test Termination
CTT-35(B) Oil Test Termination for 35kV Power Cable
Home > Systems > Inductance Resonant > Cable Test Termination > Oil Test Termination

CTT-35(B) Oil Test Termination

Lead time: 25 days.

Mode: CTT-35(B)
1) Type: Slope Type
2) Insulation Material: High quality insulation oil or Freon TE
3) Strip length of semi-conductor layer: ~45
4) AC Test: 100KV/5min
5) PD Test: 95KV <2pC
6) Cable core diameter: 60mm^2, 35KV cable, single core
7) Dimension of insulation cup: φ150, L=1100mm
8) Base dimension of slop type termination: 1090*1360mm
Power Cable Testing Oil Termination Power Cable Testing Oil Termination
Power Cable Testing Oil Termination Power Cable Testing Oil Termination
Principle Diagram: 



Addition1:
The oil test termination, as dimension is not big, and the internal oil can not be cooled by external cooling system (water conditioning unit), so not suitable for long term runing.
If your cable need test long time, we proposal use cable test termination instead.

  